Home
               
Press Room
Emergency
Information
About
Us
Board of
Directors
Careers
Community
Involvement
Energy
Efficiency
Environment
Financial
Information
Procurement
Public
Records
Services
Sources of
Electricity

 

Glossary link

 
 
Sources of Electricity
 
Rawhide
 
Wind Energy
   
Yampa Project
    
2007 Platte River Integrated
Resource Plan
(IRP)

Hydroelectricity

Hydroelectric GenerationHydroelectric generation is a valuable renewable resource in the Rocky Mountain region. Hydropower is generated when water (either from a river or reservoir) is diverted through a turbine, which then turns a generator to produce electricity. This provides a very flexible, low cost renewable resource. Much of the hydroelectric power in the west has been developed as part of the federal reclamation program. At the direction of Congress, the U.S. Bureau of Reclamation was charged with developing multi-purpose projects to provide, among other things, flood control, irrigation, recreation and water storage. Electric generation was included as a part of these projects to make more efficient use of the water and to help pay the costs associated with the projects. Power not only pays for the hydropower features of the Federal projects, but also pays most (about 90% in most cases) of the irrigation features. Included in the law are provisions that the power from the Federal projects will be sold to preference customers, primarily to non-profit municipal and rural electric systems at rates sufficient to recover the costs of operating the projects and repaying the government for the investment in the projects.

Platte River has long-term contracts (through 2024) for the purchase of federal power from the Loveland Area Projects (LAP) and the Salt Lake Integrated Projects (SLIP). This power is marketed by the Western Area Power Administration. The LAP facilities are primarily located in Colorado and Wyoming and include generation from the Colorado Big Thompson Project (between Loveland and Estes Park, Colorado), dams along the North Platte River in Wyoming, and the Mt. Elbert pumped storage project (near Leadville, Colorado). The SLIP projects include the power produced from the features of the Colorado River Storage Project at Glen Canyon Dam (near the Utah/Arizona border), Flaming Gorge Dam (near the Wyoming/Utah border), and Blue Mesa Dam (and associated Crystal and Morrow Point Dams near Gunnison, Colorado). SLIP also includes several other smaller projects in Wyoming, Colorado and New Mexico. This renewable hydroelectric power provides about 20% of the resources needed to serve the loads of the four municipal systems served by Platte River.

 

 
Platte River Power Authority 2000 E Horsetooth Rd, Fort Collins, CO 80525
Tel: 970.226.4000 or 888.748.5113  
    
Contact Us    Site Map    Español   Copyright and Conditions of Use
Copyright © 1998-2011 by Platte River Power Authority. All rights reserved.